viernes, 9 de abril de 2010

AU Dust and Dore










Please find herewith IFCL´s Gold Dust and Gold Dore Bar seller’s information. Please bear in mind that IFCL Consulting acts as Seller’s Agent as per Memo of Understanding signed October 13th 2009. Any negotiation, discussion or discrepancy between seller and buyer will be handled accordingly and solely under their responsibility. IFCL directly deals with sellers to conduct this offer.

AU Dust and Dore Bars

Murcia, April 9th 2010


1. Description of Commodity Product:
Alluvial Gold in Dust (CIF delivery)
2. Specification of Commodity
Quality: 22+ Carat for Gold Dust
Origin: West Africa (Ghana)
3. Quantity
Buyer should send LOI with full details, quantity, target price and destination directed to IFCL Consulting.
4. Delivery
Note: All shipments will be made through:
KLM CARGO, GHANA
5. Assay Report
a) Buyer’s refinery shall undertake assaying of the gold.
b) Assay report shall be issued not later than seventy two (72) hours upon delivery of gold.
6.Shipping Details
Seller confirms that each consignment of gold to the buyer shall be accompanied with the following:

a) Certificate of Origin
b) Insurance Policy
c) Gross and Net Weight
d) Three original copies of commercial invoices
e) Export Permit
f) Attestation/Certificate of Ownership that the product is free of any encumbrances and of non-criminal origin, exportable, transferable and free of liens
g) Air Waybill Number
h) Flight Number (Date and Estimated Time of Arrival)

PROCEDURES:

1. Seller sends FCO addressed only to Buyer.

2. Buyer signs and stamps the FCO to show acceptance and return to Seller and issues LOI/ICPO. Containing contact information and banking information for SPA.

3. Seller then sends Buyer Safe Keeping Receipt (SKR) from security storage firm along with Attestation of Ownership sworn to at the High Court of Ghana in Accra as POP.

4. On Buyer confirming satisfaction with the documents sent, Seller sends draft contract for private sale and purchase of product for review and if satisfied, for Buyer to complete necessary areas and return for Seller to do same.

5. Seller returns the completed contract in PDF file along with invoice. Both parties lodge the contract with their respective transaction banks and then Buyer has its bank send a non-operative bank guarantee (BG) or stand-by letter of credit (SBLC) via swift MT-760 in favor of Seller's nominated fiduciary agent to their bank (OUT OF AFRICA) as payment protection to Seller.

6. Seller then through its fiduciary agent bank sends a 2% performance bond (PB) to activate Buyer's instrument.

7. Upon acceptance of Seller's PB and activation of Buyer's BG, SBLC, Seller commences delivery of product accompanied by a representative to Buyers chosen destination airport bearing all costs from origin to destination airport.

8. Buyer receives the Seller's representative with products at airport and takes responsibility for all clearance from his airport of delivery to nominated refinery for assay accompanied by Seller's representative.

9. Title of gold passes from Seller to Buyer at this point but ownership is still retained by Seller until actually paid for by Buyer. Assay is completed within maximum of 72 hours at Buyer's chosen refinery and final assay report is issued by the refinery to both parties. The report is accepted as final and then Buyer makes payment for total refined gold which should equate the said quantity delivered. Any shortage in quantity or reduction in quality will be deducted pro-rata.

10. Upon receipt of payment by Seller, ownership is transferred to Buyer and BG or SBLC becomes void and returned to issuer.

11. On signing the contract, the transaction must be closed in 5 business days, including full banking.

miércoles, 7 de abril de 2010

Portland Cement Offer


CONTRACT

TOTAL VOLUME M/T

MONTHLY SHIPMENT M/T

PRICE US$ CIF

150.000

12.500

78,00

300.000

25.000

77,00

600.000

50.000

76,00

900.000

75.000

75,00

1.200.000

100.000

74,00

1.800.000

150.000

73,00

2.400.000

200.000

72,00

3.600.000

300.000

71,00

4.800.000

400.000

70,00

6.000.000

500.000

69,00

9.000.000

750.000

68,00

12.000.000

1.000.000

67,00

15.000.000

1.250.000

66,00

18.000.000

1.500.000

65,00

24.000.000

2.000.000

64,00

SPOT DEALS

12.500

12.500

88,00

25.000

25.000

86,00

*Non- tranferable L/C add $2 M/T

PRODUCT REQUIREMENT

PRICE ADD ON’S OR REDUCTION

ADD OR DEDUCT TO PRICELIST ABOVE

SABS CERTIFICATE

ADD

$7 PER M/T

GOST CERTIFICATE

ADD

$20 PER M/T



ORIGIN: At Seller’s option : Europe, North America, South America, excluding China.

PRODUCT QUALITY AND SPECIFICATIONS - Portland cement:

United States Standard ASTM C 150
Brittish Standard BS 12/1996
Russian Standard GOST 1017885
SABS certified contingents available at additional cost
GOST and BIS certificationavailable upon request

According to Brittish Standard 12/1996, ASTM C-150

Specifications of ordinary Portland Cement grade 42.5 N/R chemical composition

SILICON DIOXIDE (SIO2) 21.00
ALUMINIUM OXIDE (A12O3) 5.30
FERRIC OXIDE (FE2O3) 3.30
CALCIUM OXIDE (CAO) 65.60
MAGNESIUM OXIDE (MGO) 1.10
SULPHUR TRIOXIDE (SO3) 2.70
LOSS OF IGNITION (LOI) 0.90
TRICALCIUM SILICATE (C3S) 60.00
DICALCIUM SILICATE (C2S) 15.00
TRICALCIUM ALUMINATE (C3A) 8.05
TRICALCIUM ALUMINO FERRICE (C4AF) 9.76

PHYSICAL AND MECHANICAL PROPERTIES

BLAIN CM2/GR 3.250
AUTOCLAVE EXPANTION 0.02

INITIAL SETTING TIME (VICAT) 105 MINUTES
FINAL SETTING TIME (VICAT) 135 MINUTES

COMPRESSIVE STRENGTH AT 3 DAYS 230 KG/CM2

COMPRESSIVE STRENGHT AT 7 DAYS 305 KG/CM2

COMPRESSIVE STRENGHT AT 28 DAYS 420 KG/CM2

Compressive strength mortar Mpa (N/mm”): Strength Class: 42,5N

Early Strength: 2 days ˆ 10.00

Strength Class: 42,5R
Early Strength: 2 days ˆ 20.00
Standard 28 days strength: Minimum 42,5. Maximum 62,5.

PRELIMINARY PROCEDURES

1. Buyer submits a Request for quote.

1.1. Seller issues Soft Offer indicating the price, terms of payment and procedures.

2. Buyer issues ICPO/LOI with delivery schedule and bank details - Top Prime Bank, or Confirming Bank, in case the buyer’s bank is not a Prime Bank.

***Please submit ICPO/LOI along with NCNDA. In order to receive a Draft Contract the ICPO should Be supported by a Bank Endorsement.

3. Seller issues Draft Contract

4. Buyer signs Draft Contract and makes amendments if needed, subject to seller’s approval.

5. Signing and Exchanging the Final Contract.

SPOT PROCEDURES

  1. Upon signature of contract Buyer’s Bank transfers within five banking days to Seller’s Bank a non-operativeIrrevocable Fully Funded Letter of Credit covering entire amount of the contract, based on the agreed schedule of deliveries and listing Seller’s name as beneficiary, for an amount of US$ sufficient to cover one hundred percent (100%) CIF included, at sight of the shipment for the entire contract amount (+/-5).
  2. All bank instruments shall be either issued or endorsed by a Prime Bank.
  3. Within Ten banking days from receipt of Letters of Credit Seller will send POP (Proof of Product) and 2% Performance Bond of the Fully Funded LC issued, and Buyer sends the List of Shipments for approval.
  4. In the event that the Buyer fails to issue the required payment instrument within five banking days in compliance with the above clause then the value of two percent (2%) of contract’s value shall be paid at site of demand upon the Buyer without protest as a penalty for contract breach.
  5. Shipment of the Cement Portland will commence within thirty (30) to forty-five (45) days from the date of receiving the payment instrument and will continue according to the shipping schedule stated in the Letters of Credit.

CONTRACT PROCEDURES

1.. Upon signature of contract The Buyer opens a non-operative Irrevocable, Transferable, Divisible and Confirmed Revolving Documentary Letter of Credit (RDLC). This L/C shall be revolving to the value of xxxxxxx,00 US$ (xxxxxxxxxxxxxx United States Dollars) (+/- 5%) equal to one month’s delivery of XXXXXXXX MT or one twelfth (1/12) of contract’s value (+/- 5%), based on the agreed schedule of deliveries, and shall continue revolving for an amount in US$ sufficient to cover one hundred percent (100%) of eleven deliver months’ value, CIF included, at sight of the shipment (+/- 5%) and shall be in force for fourteen months and Nine days from the date of signature of contract. The second Beneficiary on the RDLC MUST stay blank.

2.. Buyer shall further open a Transferable SBLC/BG in the amount of minimum 1 (One) twelfths of contract’s value, being XXXXXXXXX,00 US$ (xxxxxxxxxxxxxxx United States Dollars) (+/- 5%), made out for Fourteen months and Nine days. Payment of the last delivery month shall be made from the SBLC/BG. The SBLC/BG will be used for Payment after the Eleventh deliver month or in the event any delivery will not be sufficiently covered by RDLC during the first Eleven deliver months.

3..All bank instruments shall be either issued or endorsed by a Prime Bank.

4.. Bank contact is only permitted between the Buyer’s Bank and our Bank. Direct contact with our bank by the Buyer will be considered as contract breach, liable to pay an indemnity of 2 % over the non delivered goods

5.. Within Twelve banking days from receipt of Non-Operative Letter of Credit Seller will send POP (Proof of Product) and 2% Performance Bond of monthly shipment such activating the non-operative RDLC, and Buyer sends the List of Shipments for approval.

6.. The Seller reserves the right not to load the vessel if the bank information does not meet requirement of this contract. Buyer shall arrange for it’s bank to provide the Seller a copy of the information by SWIFT, E-mail or Fax on the day on which it is opened.

7.. If the Buyer fails to issue the required payment instrument in compliance with this contract then the value of two percent (2%) of the non delivered goods of the contract shall be paid without protest at sight of first demand as a penalty for contract breach and the contract shall render null and void. If Seller fails to send the letter of guarantee within 12 days after receipt and approval of finacial instruments, the Seller has to pay a penalty clause of 2 % of the contract total.

8.. Shipment of the Cement Portland will commence within thirty (30) to forty-five (45) days from the date of receiving the payment instrument and will continue according to the shipping schedule stated in the Letters of Credit.

Should you have any questions or if you would like to contact us direct, please don’t hesitate to call us